COSTWAY FP11217US-WH washer: energy use, water use and yearly cost

The COSTWAY FP11217US-WH is a 1.3 cu ft compact top-load washer. On the Department of Energy's test it uses 4,142 gallons of water and 257 kWh to wash and dry 295 loads a year. Its energy factor is 1.49 against a median of 1.25 for the 48 compact top-load washers certified to DOE, more efficient than 72% of them.

$47wash + dry energy a year
4,142gallons a year
1.49energy factor (IMEF)
1.3cu ft capacity
Cost at the US average, 18.19¢/kWh · change state

Specifications

TypeCompact top-load
Capacity1.3 cu ft
Energy factor (IMEF)1.49
Water factor (IWF)10.8
Energy per year, washing + drying257 kWh (DOE test, 295 loads)
Water per year4,142 gallons · water factor 10.8 against a median of 11.5 for compact top-load washers (lower is better)
Water left in clothes after spin43.8% of the dry load weight (lower means less drying)
Certified listingFP11217US-WH · DOE basic model FP11217US-WH

Similar compact top-load washers (1.0–1.6 cu ft)

Compare the COSTWAY FP11217US-WH

Choose a washer above

Choose a washer above

Costs use the US average, 18.19¢/kWh · change

State averages: EIA Electric Power Monthly, Table 5.6.B (residential, year to date), August 2026 YTD.

Yearly figures follow the US Department of Energy test: 295 loads a year, and energy includes what a dryer needs to remove the water left after the spin (so better spinning lowers it). Your own use will differ. ENERGY STAR figures count the washer alone. Features are as listed to ENERGY STAR ("not listed" doesn't always mean missing). No official source publishes noise levels for US washers, so we don't show them.

Figures come from the federal test, so real use depends on how often and how hot you wash. In hard water you may need more detergent: check your town on the water hardness map. More: compare all washing machines, all COSTWAY washers.

Sources: US Department of Energy Compliance Certification Database (clothes washers) (downloaded 2026-11-22); DOE test procedure, Appendix J2; EIA Electric Power Monthly, Table 5.6.B (residential, year to date), August 2026 YTD.